West Garage

New electrical systems and infrastructure for a two story addition to the existing five story West Garage structure. Selective coordination was needed in order to maintain power and operation of an existing fire pump in the garage which fed two adjacent buildings. Evergreen also provided a new generator control panel and associated programming outputs to tie into Microsoft’s existing campus monitoring system.
Architect: ZGF Architects
GC:Howard S. Wright Constructors
Location: Redmond, WA
Type:Plan & Specification w/ Gerber Engineering, Inc.
Contract: $1,076,852
Sq. Ft.:92,300